A public cooling site will be open from 2 to 4:30 p.m. today through Friday at The Point, 311 Myers St., Seymour.
The facility is air conditioned and water will be provided.
A public cooling site will be open from 2 to 4:30 p.m. today through Friday at The Point, 311 Myers St., Seymour.
The facility is air conditioned and water will be provided.